Urban Development of the area "Madraza", in Granada

Location : Granada
Start Date : 25 January 2007
End Date : 07 October 2010
Budget : € 2,199,036.55
Status :

Overview

The development of the area consisted of demolishing the existing roads, pavements, lightning system, sewage system and clean water, high and low voltage, gas, telephone and optic fibre.

The next stage was to divert utilities and replace them where necessary.

Main roads, high and low voltage, sewage systems, gas, lighting installation, drinking water system, etc.

Green areas were also constructed.

 

SNC00605.jpg SNC00600.jpg