Road safety. Accesses redesign. N-432 from Badajoz to Granada, P.K. 190+000 to 224+200. Section: Peñarroya-Bélmez. Bélmez-Espiel turnoff (Córdoba). Spain.

Location : Bélmez (Córdoba)
Start Date : 31 July 2008
End Date : 30 September 2009
Budget : € 1,868,961.2
Status :

Overview

Construction of slip road on the N-392.

Works include earthworks on soil and rock, embankments, enlargement of existing road, bituminous with layers, signalling, H+S, installation of barriers, horizontal and vertical signalling.