Roads
Imathia Construction has carried out work of great importance of roads, since the construction of new roads and motorways to duplicate or improve existing ones, leading to the preservation and maintenance as a result of the above. These works can be relatively simple in flat or can have enormous technical difficulties in mountainous areas, which requires the execution of large structures and tunnels. Imathia Construction, aware of the need for all types of performances, has the authority and ability to run from simple packaging to complex urban stretches of motorway.
Motorway enlargement, motorway A-30 in Murcia, construction of the third lane carriageway between Murcia and the Puerto de la Cadena.
The works consist in expanding platform in the A-30, in the urban section of Murcia, Murcia between the link and the link Murcia Centro Norte, to incorporate a third rail along this section. For expanding the highway has been necessary to set back the batteries Station Bridge, which crosses perpendicularly through the new transfer system loads the old batteries to new construction, minimizing conditions and demolitions that have caused the demolition and subsequent reconstruction of the entire structure. In the section on the Malecon viaduct structure has made the union of two independent structures of each road, enabling the new lane to the gap between them, thus increasing for the number of piles, micro piles cemented with templates available for scarce under existing structures. As a complementary action has urbanized the service road along the entire stretch. All work has been done without affecting the traffic of the highway at any time during the day.
Client
Ministerio de Fomento. Dirección Gral. de CarreterasMurcia
Construction Dates
25 Jun 2009-26 Apr 2011 (Completed)Repair and improvement of the Road from Valsequillo (Córdoba) to Monterrubio de La Serena (Badajoz). Spain.
Layout of dual carriageway, including hard shoulders, safety barriers, lighting and construction of one roundabout.
The works included earthworks, new access roads and transverse drainage.
Stabilised soil was used as base together with the other layers to the bituminous layer.
Fencing and painting of horizontal and vertical signalling
Client
Andalusian Infrastructures AuthorityCórdoba and Badajoz
Construction Dates
05 Nov 2007-23 Sep 2009 (Completed)Road safety. Accesses redesign. N-432 from Badajoz to Granada, P.K. 190+000 to 224+200. Section: Peñarroya-Bélmez. Bélmez-Espiel turnoff (Córdoba). Spain.
Construction of slip road on the N-392.
Works include earthworks on soil and rock, embankments, enlargement of existing road, bituminous with layers, signalling, H+S, installation of barriers, horizontal and vertical signalling.
Client
Ministry of Works. Roads DivisionBélmez (Córdoba)
Construction Dates
31 Jul 2008-30 Sep 2009 (Completed)Road safety. Remodeling of intersection in the N-320, pp.kk. 277 278 +000 +000. Section: access to Guadalajara
Client
Ministerio de Fomento. Dirección Gral. de CarreterasGuadalajara